How We Work
Eight stages, five named methods and no surprises: what happens, in what order, and what we need from you.
How we work
Every job follows the same eight stages, so you know what happens next.
Enquiry
You call, message us on WhatsApp or send the quote form. We note what you want and arrange a visit.
Site visit and measure
We come to your property, look at access, levels and drainage, and measure up. This is free.
Written fixed quote
You receive a written fixed quote that sets out the work, so you can compare it with confidence.
Groundwork plan
We agree the dig depth, base, edging and where the water will go before any work starts.
Dig-out and base
We excavate, remove spoil and build the sub-base in compacted layers, because the base decides how long the surface lasts.
Laying
We lay your chosen surface to the agreed levels and falls, cutting neatly at edges and drains.
Finishing and sealing
We fill and brush joints, apply sealing where the material calls for it, and tidy the edges.
Handover and aftercare
We walk you round the finished job and explain how to look after it.
Realistic timeline expectations
More questions? See the FAQs.
Every job is different, so we do not promise one fixed timeline. What we can say honestly is what drives the length of a job: the size of the area, how easily materials and spoil can be moved in and out, what the ground needs, the surface chosen, and the weather. Wet weather matters most on groundwork, tarmac and concrete, and in Hull the ground is often clay that holds water.
| Stage | What affects the time | Typical time |
|---|---|---|
| Enquiry to site visit | Our diary and yours | We aim to arrange a visit within one day. |
| Site visit to written quote | Size and complexity of the job | We aim to provide a written quote within one day of a site visit. |
| Accepting the quote to starting | Material lead times, our booking list, council approval where needed | We aim to start within 1 to 2 weeks of an accepted quote, subject to weather and materials. |
| Dig-out and base | Area, depth, ground and access | Usually 1 to 3 days for a typical domestic job |
| Laying and finishing | Surface, pattern, cutting and weather | Usually 2 to 5 days, depending on the surface |
| Before vehicles or foot traffic | Surface and any curing or sealing | We tell you for your surface: foot traffic first, vehicles later |
Your service page gives more detail for each surface, and your written quote gives the timescale for your job. We would rather give you a realistic window than a hopeful one.
The eight stages in detail
1. Enquiry
You call us on 07544 358 238, message us on WhatsApp or send the quote form. We note what you want, roughly where the job is and what you have in mind, and arrange a visit. It helps if you can tell us the rough size of the area, what is there now and any photos you have. We aim to respond to enquiries within one hour.
2. Site visit and measure
We come to your property, look at access, levels and drainage, and measure up. This is free and carries no obligation. This is where the Humber Ground Assessment happens: we walk the area, probe the ground, check for services, manholes, trees and boundaries, and measure the area and the falls.
3. Written fixed quote
You receive a written fixed quote that sets out the work, so you can compare it with confidence. What we found at the visit goes into it, so the dig depth and the base follow from the ground. It should show the surface, the area, the groundwork, the edging and the drainage plan.
4. Groundwork plan
Before any work starts, we agree the dig depth, base, edging and where the water will go. This is the Drainage-First Plan: where water runs now, falls away from the house, and the outlet, whether that is a lawn, border, soakaway or permeable surface. We also check whether planning permission or a dropped kerb is needed; see drainage and permeable paving and dropped kerbs.
5. Dig-out and base
We excavate, remove the spoil and build the sub-base in compacted layers, because the base decides how long the surface lasts. This is the Deep-Base Build: deeper where the ground is soft, and more for a driveway than a patio. Concrete-backed edging holds the edges. This is also where the Clean-Site Promise applies: spoil cleared as we go, materials stacked so access is not blocked, dust and waste contained.
6. Laying
We lay your chosen surface to the agreed levels and falls, cutting neatly at edges and drains. The detail differs by surface, so see the page for porcelain, Indian sandstone, block paving, tarmac, resin bound, imprinted concrete or concrete that you are having.
7. Finishing and sealing
We fill and brush joints, apply sealing where the material calls for it, and tidy the edges. The area is swept at the end of the working day and at completion.
8. Handover and aftercare
We walk you round the finished job and explain how to look after it. This is the Photo-Proof Handover: we photograph the dug-out ground, the sub-base and the edging before they are covered, and the finished job, and send the photos to you.
What you need to do
Most of the work is ours, but a few things from you make the job smoother:
- Tell us what you want and how you will use it. A drive for one family car needs a different build from one for heavier vehicles, and a patio for a table and chairs is different again.
- Be there for the site visit, or have someone who can show us round. We need to see the area and understand your access.
- Read the written quote and ask questions. If anything is unclear, ask before you accept.
- Agree access. Tell us about parking, gates, narrow side access and neighbours. Deliveries and spoil removal need space.
- Move vehicles, furniture and plants out of the work area. We agree at the site visit who moves what, and how plants and garden features near the work are protected.
- Tell us about services you know of, such as cables, pipes and drains, and anything buried that you know about.
- Sort out any approvals that sit with you. If a dropped kerb or planning permission is needed, it must be in place before work starts. We explain what is needed and help with the paperwork where we can, although some applications have to be made by you as the householder
- Keep people and pets off new work. We will tell you how long.
The named methods
These are the five working methods we use. They describe how we work and are not guarantees; anything measurable is given in your written quote.
- Humber Ground Assessment (stages 2 and 3): decide what the ground needs before we quote.
- Deep-Base Build (stage 5): a base sized to the ground and the load, built in compacted layers with concrete-backed edging.
- Drainage-First Plan (stage 4): decide where water goes before choosing the surface.
- Clean-Site Promise (stages 5 to 8): keep the site tidy and safe while work is under way.
- Photo-Proof Handover (stage 8): show what is now hidden under the surface.
Where a specification matters, such as how deep to dig or how thick the sub-base should be, we state it in the quote for your ground. Where we give a general figure on a service page, we say it is an industry norm and not our own specification.
How we work: common questions
Do I have to be at home during the work?
You do not need to be at home all day, although it helps to be there at the start and at handover. We will agree access with you at the site visit.
What if you find something unexpected in the ground?
That is what the ground assessment is for, and we note what we find in the quote. If something unexpected turns up once the dig starts, we tell you before we change the work.
Can the plan change after I accept the quote?
Small changes can usually be agreed. Anything that changes the price is agreed with you in writing first.
When do I pay?
A deposit and any stage payments are agreed in writing before work starts. Payment terms are set out in the written quote.
How soon can you start?
We aim to start within 1 to 2 weeks of an accepted quote, subject to weather and materials. We give you a start window in the quote.